S U N C R A F T

Loading

Solar Installation in Gwarinpa Abuja

Project Details

It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout.

Client

Mr John

Location

Gwarinpa Abuja

Power (KWp)

3000

Total Cost

#2,690,000

Date

14-07-2022


Facebook-f


Twitter


Youtube


Whatsapp

Project Summary

5kva with 10kw Lithium battery and 350 watts solar Panels 12X

We are No 1 Solar Installers in Nigeria. We sale, install, maintain and service solar panels and inverters in Abuja, Port Harcourt, Lagos-Lekki, Ikoyi, Eneugu, Anambra, Imo State


 




Overview & Challenge​

Wind and solar energy are complementary to each other, which makes the system to generate electricity almost throughout the year. The main components of the Wind Solar Hybrid System are wind aero generator and tower, solar photovoltaic panels, batteries, cables, charge controller and inverter. The Wind – Solar Hybrid System generates electricity that can be used for charging batteries and with the use of inverter we can run AC appliances. Wind aero-generator is installed on a tower having a minimum height of 18 mtrs. from the ground level. Because of the height, the aero-generator gets wind at higher speed and thereby generates more power.The Wind – Solar Hybrid System generates electricity that can be used for charging batteries and with the use of inverter we can run AC appliances.

Verified by MonsterInsights